MIL-DTL-50523A
4. VERIFICATION
TABLE I. Requirement/verification cross reference.
Method of verification
Classes of verification
1 Analysis
A First article
2 Demonstration
B Conformance
3 Examination
4 Test
Section 3
Description
Verification
Verification
Section 4
Requirement
Methods
Class
Verification
1234
A
B
3.1.1
First article
XXX
X
4.3
3.1.2
Conformance inspection
XXX
X
4.4
3.2.1
Demolition charge
XX
X
X
4.4.2.1-
4.4.2.4
3.2.1.1
Physical properties
X
X
X
4.5.1
3.2.1.2
Specific gravity
X
X
X
4.5.2
3.2.1.3
Energy output
X
X
X
4.5.3
3.2.1.4
Ability to cut and mold
X
X
X
4.5.1, 4.5.3
charge
3.2.2
Wirebound box
X
X
X
X
4.4.2.2 -
4.4.2.4
3.2.2.1
Heat seal of barrier bag
X
X
X
4.5.4
3.3
Ammunition lot number
X
X
X
4.5.5
3.4
Workmanship
X
X
X
4.4.2.1-
4.4.2.4
4.1 Classification of inspections. The inspection requirements specified herein are
classified as follows:
a. Physical configuration audit (see paragraph 4.2)
b. First article (see paragraph 4.3)
c. Conformance (see paragraph 4.4)
4.2 Physical configuration audit (PCA). When specified, a sample shall be submitted to
Physical Configuration Audit (PCA).
4.2.1 PCA quantity. The PCA shall consist of 100% verification of all requirements of
drawings 13021902 and all of their components, assemblies, subassemblies, materials and
components. Not less than five (5) samples of each component, etc. for all requirements shall be
verified.
4.2.2 PCA rejection. If any item of the sample fails to comply with the PCA
requirements, the sample shall be rejected.
4
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business