MIL-DTL-50523A
Drawing Number
4.4.2.1
M112 demolition charge.
9204248
Next Higher
Classification
Examination or Test
Assembly
Conformance
Requirement
Criteria
Paragraph
Inspection Method
Reference
Critical
None defined
Major
101
Weight
VL-IV
3.2.1
Balance
102
Length
VL-IV
3.2.1
Gage
103
Width
VL-IV
3.2.1
Gage
104
Thickness
VL-IV
3.2.1
Gage
1/
105
Physical Properties
3.2.2
4.5.1
2/
106
Specific Gravity
3.2.3
4.5.2
3/
107
Energy Output Test
3.2.4
4.5.3
VL-IV
108
Charge container missing, punctured,
3.2.1
Visual
torn or otherwise damaged exposing
VL-IV
109
explosive
3.2.1
Gage
VL-IV
110
Width of heat seal
3.2.1
Visual and Gage
Pressure sensitive tape missing,
VL-IV
111
improperly applied, or incorrect length
3.2.1
Visual
Marking (other than warning marking)
VL-IV
missing, incorrect or unidentifiable
3.2.1
Visual and Tactile
112
Sealing clip missing or insecure
100%(b)
Warning marking missing, illegible or
3.2.1
Visual
113
incorrect
Minor
VL-II
Charge improperly assembled into
3.2.1
Visual
201
container
VL-II
Wax paper not removed (when
3.2.1
Visual
202
VL-II
applicable)
3.3
4.5.5
203
VL-II
3.4
Visual
Ammunition lot numbering
204
Evidence of poor workmanship
Notes:
1/ Table III, MIL-STD-1916, VL IV. Reduced inspection level not authorized.
2/ Total of 10 sample units.
3/ Total of 5 sample units.
(b) 200% shall be required for manual visual inspections. 100% is acceptable only if inspection is being performed
with an automated vision system.
7
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business