MIL-DTL-50911B
TABLE II. First article tests and inspection.
Examination or Test
Drawing
Sample Size
Requirement
Verification
Number
Paragraph
M1 detonating cord clip
8861109
Examination of Defects
10
3.3
4.4.2.1
Booster cup
8861120
Examination of Defects
10
3.3
4.4.2.2
Booster assembly
8861119
Examination of Defects
10
3.3
4.4.2.3
Weight of Charge
10
3.5
4.5.2
Priming assembly
9219074
Examination of Defects
10
3.3
4.4.2.4
Output
3
3.6
4.5.3
4.4 Conformance inspection.
4.4.1 Lot formation. Lot formation shall be in accordance with MIL-STD-1916. In
addition, each inspection lot of priming assemblies shall be produced with components
complying with the following constraints:
a.
Detonating fuse from not more than one lot interfix number from one
manufacturer.
b.
Comp A5 from not more than one lot interfix number from one
manufacturer.
c.
Cup boosters from not more than one lot interfix number from one
manufacturer.
d.
Clip cords from not more than one lot interfix number from one
manufacturer.
4.4.2 Classification of characteristics.
a. Sampling requirements. Inspection sampling requirements for critical, major and minor
characteristics are defined in MIL-STD-1916. Unless specified otherwise, Inspection Level VII
in addition to 100% inspection shall be used for all characteristics defined as Critical, Inspection
Level IV shall be used for all characteristics defined as Majors and Inspection Level II for all
Minor characteristics.
b. Inspection. Conformance inspection shall be performed in accordance with section
4.4.2.1 through 4.4.2.5. For all conformance inspections the same sample specimen may be used
for all non-destructive examinations or tests.
5