MIL-DTL-417H
dimensional stability is attained. The inspection data used in determining the curing time should
be sent to U.S. Army RDECOM-ARDEC, ATTN: RDAR-QEM-G, Picatinny, New Jersey
07806-5000. If there is a change in material, cycle time, or if a cavity is reworked, or a new
cavity is used, a new curing time should be established and approved.
6.5 Subject term (key word) listing.
Universal Destructor
Bangalore Torpedo
Tetrytol
TNT
Shape Charge
SLAM
6.6 Changes from previous issue. Marginal notations are not used in this revision to
identify changes with respect to the previous issue due to the extent of the changes.
Custodian:
Preparing Activity:
Army-AR
Army-AR
Navy - OS
(Project: 1375-2011-001)
Air Force - 11
Review activities:
Navy AS, NP
Air Force 70, 99
DLA - FAS
NOTE: The activities listed above were interested in this document as of the date of this
document. Since organizations and responsibilities can change, you should verify the currency of
the information above using the ASSIST Online database at https://assist.daps.dla.mil
7
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business