MIL-DTL-45144E
DRAWING NUMBER
NEXT HIGHER ASSEMBLY
SHEET 1 OF 1
4.3.3.2. Fuse Blasting Time: M700, finished.
CONFORMANCE
REQUIREMENT
PARAGRAPH REFERENCE/
CATEGORY
EXAMINATION OR TEST
CRITERIA
PARAGRAPH
INSPECTION METHOD
EXAMINATIONS
Critical
None defined.
Major
101
Color of plastic.
IV
3.8.5
Visual
102
Diameter of fuse.
IV
3.10
Gage
103
Length of fuse.
IV
3.11
Gage
104
Asphalt coating weight.
IV
3.7.1
Visual
105
Plastic coating thickness.
IV
3.8.2
Gage
106
Marking color.
IV
3.13.4
Gage
107
Marking width.
IV
3.13.5
Visual
108
Marking coverage.
IV
3.13.6
Gage
109
Marking application method and materials.
IV
3.13.3
Visual
110
Single band marking.
IV
3.13/3.13.1
Gage
111
Double band marking.
IV
3.13/3.13.2
Gage
112
No splices.
IV
3.12
Visual
113
Functioning
10 at Hot;
3.3/3.15/
4.4.1
30 at Ambient;
3.16/3.17
10 at Cold
114
Waterproofness.
30
3.18
4.4.2
Minor
201
Plastic workmanship.
II
3.8.3
Visual
202
Workmanship
II
3.19
4.4.8
13
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business