MIL-DTL-45144E
DRAWING NUMBER
NEXT HIGHER ASSEMBLY
SHEET 1 OF 1
4.3.3.3. Dummy Fuse Blasting Time, Inert, prior to
asphalt coating.
CONFORMANCE
REQUIREMENT
PARAGRAPH REFERENCE/
CATEGORY
EXAMINATION OR TEST
CRITERIA
PARAGRAPH
INSPECTION METHOD
EXAMINATION
Critical
None defined.
Major
101
Diameter of fuse.
IV
3.9
Gage
102
Presence of 3 cotton center longitudinal yarns.
IV
3.5.1
Visual
103
Continuous train of inert fuse powder.
IV
3.4
CoC
104
Presence of 10 spinning jute yarns.
IV
3.6.1
Visual
105
Jute yarn spinning twist.
IV
3.6.1
Visual
106
Jute yarn spinning covers the fuse powder.
IV
3.6.1
Visual
107
Presence of 10 countering cotton yarns.
IV
3.5.2
Visual
108
Cotton countering yarn twist.
IV
3.5.2
Visual
109
Color of fuse powder
IV
3.4
Visual
Minor
201
Workmanship
II
3.19
4.4.8
14
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business