MIL-DTL-2156D
Drawing number
4.3.2.4
Assembly (as applicable)
8861565
Next higher assembly
Conformance
Requirement
Paragraph reference/
Category
Examination or test
criteria
paragraph
inspection method
Critical
None defined
Major
101
Gage does not enter detonator well freely
IV
3.4
Visual
to full length
102
Closing cap assembly loose
IV
3.4
Manual
103
Protective tape missing
IV
3.4
Visual
104
Functioning Test
10, see 1/
3.5
4.3.3.4
Minor
201
Total length
II
3.4
Gage
202
Marking missing, incorrect or illegible
II
3.4
Visual
203
Color coding improper (see Dwg.
II
3.4
Visual
8861569)
204
Evidence of poor workmanship
II
3.6
Visual
NOTE:
1/ Any test unit which fails to detonate high order shall be classified as defective. After three (3) consecutive lots have met the criteria, a sample
of five (5) test units shall be selected and function tested out of each lot produced. If one or more loaded units fail to function, the sampling shall
return to the original test plan and continue until three (3) consecutive lots have complied with the acceptance criteria specified.
10
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business