MIL-DTL-2156D
Table II. First article inspection
E
Conformance
Requirement
Paragraph reference/
xamination or test
criteria
paragraph
inspection method
Radiographic examination
10, see 1/
3.1.1
4.3.3.3
Functioning Test
10, see 1/
3.4
4.3.3.4
Parts Assemblies
Examination of defects (where
4.3.2.2 & 4.3.2.3
applicable) and Average
25
3.3
4.3.3.2
Weight
Booster
Examination of defects and
10
3.2
4.3.2.1 and 4.3.3.1
Specific Gravity (8858393)
Loading Assemblies
Examination of defects (where
4.3.2.3 thru 4.3.2.5
applicable) and Weight of
25
3.3
4.3.3.2
Charge (8861565)
Fiberboard and Packing boxes
Examination of defects (where
10
3.2
4.3.2.5 thru 4.3.2.9
applicable) and heat seal test of
sealed bag (9281170)
NOTE:
1/ Radiographic examination shall be conducted on the First Article samples that are to be subjected to the
Functioning Test, prior to the execution of the Functioning Test. Radiographic examination data will not be
used to accept/reject this system. Any test unit which fails to detonate high order shall be classified as
defective.
4.3 Conformance inspection.
4.3.1 Inspection lot formation. Inspection lots shall comply with the lot formation provision of MIL-
STD-1916. In addition, inspection lots of loaded shaped demolition charges shall contain:
a. Parts or part assemblies from not more than one lot interfix number from one manufacturer.
b. Composition B of the same grade from one lot interfix number from one manufacturer which
contains TNT from not more than one lot interfix number from one manufacturer.
c. Composition A-3 from not more than two lots from one manufacturer.
5
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business