MIL-DTL-2156D
4. VERIFICATION
Table I. Requirements/verification cross reference matrix
Method of Verification
Classes of Verification
A - First article
1- Analysis
2- Examination
B - Conformance
3- Test
Verification
Verification
Section 4
Section 3
Method
Class
Description
Requirements
1
2
3
A
B
3.1
First article
X
X
X
X
4.2
Radiographic
3.1.1
X
4.3.3.3
examination
Conformance
3.2
X
X
4.3
inspection
4.3.2.1-
3.3
Material
X
X
X
X
X
4.3.2.9
Specific gravity of
4.3.2.1,
3.3.1
X
X
X
booster
4.3.3.1
Average weight of
4.3.2.3,
3.3.2
X
X
X
loading assemblies
4.3.3.2
3.4
Assemblies
X
X
X
X
4.3
4.3.2.4,
3.5
Functioning test
X
X
X
4.3.3.4
3.6
Workmanship
X
X
X
4.3
4.1 Classification of verification. The verification requirements specified herein are
classified as follows:
a. First Article Inspection (see 4.2)
b. Conformance Inspection (see 4.3)
4.2 First article.
4.2.1 Submission. When specified, a sample of the shaped charge and subcomponents
shall be subjected to first article inspection in accordance with provisions of 4.2.2 and Table II.
4.2.2 Inspections to be performed. The first article samples shall be subjected to all of
the examinations and tests specified in Table II.
4.2.2.1 Rejection. The first article sample shall be rejected if any of the inspections/tests
fail to meet specification or drawing requirements.
4
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business