MIL-DTL-45468F(AR)
4.2.1 Submission. When specified, a first article sample of 190 M6 caps shall be
submitted for evaluation in accordance with the provisions of 4.2.2, Table II, and Figure 1.
4.2.2 Rejection. The first article sample shall be rejected if any of the inspections/tests
fail to meet specification or drawing requirements.
TABLE II. First article inspection.
Conformance
Requirement
Paragraph reference/
Examination or test
criteria
paragraph
inspection method
Examination for defects
190
3.2 3.3
4.3.2.2 4.3.2.9
Moisture content of lead azide
2 grams
3.4
4.3.3
Lead wires pull test
190
3.5
4.3.4
Resistance of bridgewire and
190
3.6
4.3.5
leads
No-fire
190
3.7
4.3.6
Waterproofness
110
3.8
4.3.7
Ampere initiation
50
3.9.1
4.3.8.1
Milliwatt-second initiation
50
3.9.2
4.3.8.2
50 cap series
50
3.9.3
4.3.8.3
4 cap series
40
3.9.4
4.3.8.4
Packing and marking
5
3.3
4.3.2.7 4.3.2.9
Marking performance and
3
3.10
4.3.9
durability
FIGURE 1. First article test and lot acceptance test sequence.
4.3 Conformance inspection.
6
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business